Battery energy storage (BESS) design has become one of the most complex and heavily regulated segments of solar engineering. NFPA 855 fire code compliance, NEC Article 706 electrical requirements, UL 9540 product listing verification, and the specific integration decisions between AC-coupled and DC-coupled architectures make solar plus storage design a specialty that most solar companies struggle to staff in-house. RIH Engineering delivers battery storage design services as an outsourced BESS design partner for US solar EPCs, installers, and developers scaling into solar plus storage.
BESS design touches multiple code jurisdictions simultaneously: electrical (NEC 706), fire (NFPA 855, IFC), building (IBC), and product listing (UL 9540). Getting all four right on the same project requires expertise across all four domains, which most solar companies don't have in-house. The result is either avoiding BESS projects entirely or delivering them slowly with high revision cycles.
We take BESS design off your plate as a complete package. You send us the project requirements, customer backup or peak shaving goals, and site conditions. We come back with a full BESS design including electrical, fire code compliance, structural mounting, and signage, ready for AHJ and fire marshal review.
BESS projects fail permit submissions at rates 2 to 3x higher than PV-only projects, mainly because fire code and NFPA 855 requirements are unfamiliar to solar teams. Each failed submission means weeks of delay, damaged AHJ and fire marshal relationships, and customers watching your team struggle with what looks like a straightforward addition.
Meanwhile the solar+storage market is growing 40 to 60 percent per year in the US. Companies that can't deliver BESS quickly are getting priced out of the fastest-growing solar market segment. Every quarter you delay building BESS capability is a quarter of missed pipeline.
Send us one BESS project. We deliver the complete design in 5 to 14 days depending on complexity and jurisdiction. You compare the deliverable against what your in-house team could have produced. If it doesn't meet your bar, we adjust. No long-term commitment required.
Our BESS team maintains current knowledge of NFPA 855 (including 2023 edition updates), NEC Article 706 across recent code editions, UL 9540 product listings for major battery vendors (Tesla, Enphase, SolarEdge, LG, Franklin, Panasonic, and others), and AHJ-specific BESS enforcement patterns across major US jurisdictions.
Our BESS team works in AutoCAD, AutoCAD Electrical, Revit for structural mounting details, and manufacturer-specific design tools (Tesla Powerwall Design Tool, Enphase Enlighten, SolarEdge Designer, and others). We stay current on UL 9540 listings, NFPA 855 code updates, and AHJ-specific BESS enforcement patterns.
Client-preferred tools: Our team can be trained to use the tool preferred by the client. If your workflow depends on a specific platform, template, or drafting standard, we adapt to it rather than force you into ours.
Get in touch and we'll respond within 24 business hours with pricing, engagement terms, and next steps.